Cavendish Road SHS Multipurpose Hall

[01.03.2019] Drawings of the Cavendish Road SHS multipurpose hall.

[28.01.2019] The Cavendish Road SHS multipurpose hall is currently under construction.

[18.11.2018] The framing is almost completed and the forms are starting to take shape.

img_1475

[20.09.2017] Concept renders for the Cavendish Road SHS multipurpose hall.

Leave a Reply